Wednesday, June 24, 2009

April with a water catchment



The catchment
Mark has been building a Catchment this month and he has done a great job it has taken a long time and a lot of work but now he will be able to use the pasture better with the 4 troughs that he has put in so he can pump water all over Houds. there is even a hydrant at the coral



the apron.

the pond Shayla sliding on the pond liner



the poned with the liner in
puting the pondliner in




The water tanks


The 2 fencse around the catchment










No comments: